Audi S4

since 2000 release

Repair and operation of the car



Audi S4
+ Introduction
+ Governing bodies and methods of safe operation
+ Current leaving and service
+ Engine
+ Cooling systems, heating and air conditioner
+ Power supply systems, release and decrease in toxicity of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling, power shafts and differential
+ Brake system
+ Suspension bracket and steering
+ Body
- Onboard electric equipment
   Specifications
   Diagnostics of malfunctions of onboard electric equipment - the general information
   Rassoyedineniye of sockets
   Check of the electric motor of a screen wiper
   Check of the warmed back glass
   Check of stoplights
   Removal and installation of a sound signal
   Removal and installation of sensors of the parking
   Replacement of the battery of the remote control of the ignition key
   Relay and safety locks
   Replacement of glow lamps of devices of external lighting
   Removal and installation of headlights
   Removal and installation of the side repeater of turns
   Removal and installation of an additional stoplight
   Removal and installation of a back lamp
   Removal and installation of a lamp of illumination of registration plate
   Removal and installation of plafonds of internal lighting
   Removal and installation of the control panel
   Removal and installation of the understeering switch
   Removal and installation of switches of a forward door
   Removal and installation of the switch of light
   Removal and installation of the switch of a window regulator in a back door
   Removal and installation of the switch of a trunk lid
   Removal and installation of the switch of the parking brake
   Removal and installation of the switch of illumination of a ware box
   Removal and installation of switches of the central console
   Removal and installation of the radio receiver / navigation device / CD changer
   Removal and installation of loudspeakers
   Removal and installation of antennas
   Removal and installation of the tank of liquid of the windscreen washer/electric motor of the pump
   Removal and installation of the electric motor of screenwash
   Removal and installation of the electric motor on back glass (Station wagon)
   The uniform lock - the general information
   Removal and installation of a locking element of a cover of the fuel tank
   Digital tire of data of CAN
   + Schematic diagrams of electric equipment


4affa92a



Removal and installation of a locking element of a cover of the fuel tank

Removal

 PERFORMANCE ORDER

  1. Disconnect a negative cable (-) of the rechargeable battery.

Observe indications of the Section Replacement of the Rechargeable Battery.

  1. Remove the right side facing in a luggage carrier, address the Sections Removal and installation of facings (Sedan) and Removal and installation of facings (Station wagon).
  1. Disunite the socket.
  1. Turn off by means of the special AUDI T10010 tool bolts (arrows on an accompanying illustration), displace an adjusting element forward and take out it.

Installation

 PERFORMANCE ORDER

  1. Displace emergency blocking (3) over a blocking pin of an adjusting element.
  2. Establish an adjusting element so that the blocking pin entered the closed cover of the fuel tank (2). Displace an adjusting element back and tighten fastening bolts.
  3. Join the socket and establish side facing in a luggage carrier, address to the Sections Removal and installation of facings (Sedan) and Removal and installation of facings (Station wagon).
  4. Attach a negative cable (-) of the rechargeable battery.

Observe indications of the Section Replacement of the Rechargeable Battery.