Audi S4

since 2000 release

Repair and operation of the car



Audi S4
+ Introduction
+ Governing bodies and methods of safe operation
+ Current leaving and service
+ Engine
+ Cooling systems, heating and air conditioner
+ Power supply systems, release and decrease in toxicity of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling, power shafts and differential
+ Brake system
+ Suspension bracket and steering
+ Body
- Onboard electric equipment
   Specifications
   Diagnostics of malfunctions of onboard electric equipment - the general information
   Rassoyedineniye of sockets
   Check of the electric motor of a screen wiper
   Check of the warmed back glass
   Check of stoplights
   Removal and installation of a sound signal
   Removal and installation of sensors of the parking
   Replacement of the battery of the remote control of the ignition key
   Relay and safety locks
   Replacement of glow lamps of devices of external lighting
   Removal and installation of headlights
   Removal and installation of the side repeater of turns
   Removal and installation of an additional stoplight
   Removal and installation of a back lamp
   Removal and installation of a lamp of illumination of registration plate
   Removal and installation of plafonds of internal lighting
   Removal and installation of the control panel
   Removal and installation of the understeering switch
   Removal and installation of switches of a forward door
   Removal and installation of the switch of light
   Removal and installation of the switch of a window regulator in a back door
   Removal and installation of the switch of a trunk lid
   Removal and installation of the switch of the parking brake
   Removal and installation of the switch of illumination of a ware box
   Removal and installation of switches of the central console
   Removal and installation of the radio receiver / navigation device / CD changer
   Removal and installation of loudspeakers
   Removal and installation of antennas
   Removal and installation of the tank of liquid of the windscreen washer/electric motor of the pump
   Removal and installation of the electric motor of screenwash
   Removal and installation of the electric motor on back glass (Station wagon)
   The uniform lock - the general information
   Removal and installation of a locking element of a cover of the fuel tank
   Digital tire of data of CAN
   + Schematic diagrams of electric equipment


4affa92a



Removal and installation of the tank of liquid of the windscreen washer/electric motor of the pump

Removal

 PERFORMANCE ORDER

  1. Open a cowl and remove the top left cover of the engine (1) if it is established.
  1. Disconnect a negative cable (-) of the rechargeable battery.

Pay attention to the indication of the Section Replacement of the Rechargeable Battery.

  1. Turn out a bolt and a nut (arrows on an accompanying illustration) and take out the top tank of windscreen washer from the lower tank. Take out the water pipeline from the top tank.

Lifting operation and installations of the car on supports is connected with danger! Therefore before carrying out operation study Poddomkrachivaniye's Section and towage.

  1. Weaken bolts of fastening of a wheel. Lift and establish a forward part of the car on supports.
  2. Remove a loker of the left wing, address the Section Removal and installation of a loker of a forward wing.
  1. Turn out bolts with (1) on (3) and reject the lower tank a little back.
  1. Disunite all sockets with (2) on (4) tank.
  1. Press an unblocking and disunite the hose coupling (1) of the electric motor of the pump of windscreen washer.
  2. Disconnect a water hose (5) of the electric motor of the pump of a screen wiper.
  3. If it is necessary, disconnect electric motors of pumps.
  4. Take out the tank of their wheel casing down.

Installation

 PERFORMANCE ORDER

  1. Installation is carried out in the sequence, the return to removal. At the same time the water hose has to be recorded distinctly on the pump. Tighten bolts of fastening of the tank in the sequence (1-2-3) the moment of 7 Nanometers.